Service Costs

Heidelberg currently has sufficient capacity in all services (Power, Water sanitation, refuse removal and other infrastructure) to sustain a significant influx of new industrial development, and they already - established industries will attest to the high standard of these services.

The current cost of these services is listed below:
  • For both power and water, there is an initial connection charge, which depends on the input connection size for electricity (KVA requirement) and the volume of water anticipated to be used. By e-mailing or faxing your requirements to the contact specified below, you will receive the charges applicable specifically to you.
  • A deposit equal to the anticipated average usage over 3 months, for both power and water, is required before these services can be connected.
  • Heidelberg Bulk Power input is 11KVA
For more specific information and the latest update on the details, please feel free to contact us.

Hennie Coetzee
Position: Executive Manager
Department: Engineering Services
Telephone: +27 16 340 4379,
Fax: +27 16 340 4333,
E-mail: Coetseehb@lesedilm.co.za
 
HEIDELBERG, CLEAN, SAFE COUNTRY LIFESTYLE with all the "BIG CITY" BENEFITS!